Time schedule of 911 in algebraic form

I guess no-one is interested in this, as I got no comments on my previous analysis, but it is also possible that the presentation format was not ideal. Therefore, I here present the data in a form which anyone with a mathematical or engineering background, even far below college level should understand.

(OBS entry is not ready, I pressed publish instead of save draft)
Update:I have decided to not publish the algebraic time relations of the 911 event. Anyone skilled in math can do it easily if they want, using the data¬† from my previous analysis. The reason for not publishing them, is that nobody seems interested in them. If I get a lot of requests I’ll publish them, but it’s also a good and simple exercise in algebra to do it on your own.

Best wishes/Roland